Li, Fang, and Nurazim Ibrahim. 2026. “Identifying Construction-Stage Management Problems in Super High-Rise Projects: A Qualitative Study of BIM and Smart-Site Practices in Xi’an, China”. Journal of Advances in Engineering and Technology 3 (4). https://doi.org/10.62177/jaet.v3i4.1738.