Li, F., & Nurazim Ibrahim. (2026). Identifying Construction-Stage Management Problems in Super High-Rise Projects: A Qualitative Study of BIM and Smart-Site Practices in Xi’an, China. Journal of Advances in Engineering and Technology, 3(4). https://doi.org/10.62177/jaet.v3i4.1738