Zhang, X., C. Qin, R. Zhou, L. Cai, and X. Liu. “‘Digital-Physical Integration: A New Chapter for Factory No. 2’ — A Survey of the Current Status and Research on Optimization Pathways for the Revitalization of Chongqing’s E’ling Factory No. 2 Industrial Heritage”. Asia Pacific Economic and Management Review, vol. 3, no. 4, July 2026, doi:10.62177/apemr.v3i4.1501.