Zhang, X., Qin, C., Zhou, R., Cai, L. and Liu, X. (2026) “‘Digital-Physical Integration: A New Chapter for Factory No. 2’ — A Survey of the Current Status and Research on Optimization Pathways for the Revitalization of Chongqing’s E’ling Factory No. 2 Industrial Heritage”, Asia Pacific Economic and Management Review, 3(4). doi: 10.62177/apemr.v3i4.1501.